ihave a statement i sent and got half my money down,the first one i was to do three counter topsand repalce the wood,,they wanted all of them done and in less time,i doubled the bid and sent them a statement telling them what i would do,go over all old counters with new formica,,did not say anything about replacing the wood,,they sent me half the money ..i start the job with four days to try and compleate,building has drivet on the outside they have a bad mosture problem,glue was not doing right haveing a lot of problems,i got into the sides some with the router,told the lady i would have to come back and i would fix it all,was short on material(lumber co figures it for me) doc told me to leave and not come back,i said i could fix it,three weeks later they want me back but stipulations and want the wood on the counters i told them that the contract changed with the new bid,wahts things replace that i did not do and wants me to inital what they want replaced and sign it??what to do??