My concrete dock has been undermined by wave action and there's a huge area underneath with no rocks there. It's the front side, facing the water that needs repair. Apparently, the bottom part was filled with rocks, then the conrete was poured in. The top foot or so is solid concrete. The water level is quite low right now, so only about 8" would be under water. I'm planning to put more rocks in there to help fill the space. Is this going to work, or would I be wasting my time and money?
2007-09-07
14:00:48
·
13 answers
·
asked by
Mr. Kitty
1