The drain runs into a field line that is clogged up. So Im putting new field lines in. I was also wondering also how long of a field line do I need for a Large capacity washing machine?

2007-12-23 14:26:50 · 2 answers · asked by Anonymous in Home & Garden Maintenance & Repairs

It will only be a field line for the washing machine and does not go into a sewer or septic tank.

2007-12-23 14:48:31 · update #1

2 answers

ok you need a to lay the pipes . below the frost line
normal is 16 to 18 ins, if you run about 60ft out that will
work fine , at the end of the 60 ft , dig a square, 3ft deep x 3ft . this is call ed the soak pit , thsi is where the mass of the water will stay and soak into the ground,
if you hire a trencher, you can do this in one hour tops
but make sure you glue the 1inch pipes together,

2007-12-23 16:04:24 · answer #1 · answered by Anonymous · 1 0

at least 100 ft. dig a trench 2 ft or deeper trench, put in a 6 inch layer of crushed rock lay pipe fill with crushed stone up to 8 inches of ground level, fill rest with dirt

2007-12-23 14:44:08 · answer #2 · answered by William B 7 · 1 0