1 shovel of cement
2 of sand
4 of gravel
2007-09-23 21:58:07
·
answer #1
·
answered by sapperhutch 2
·
3⤊
1⤋
every answer so far is wrong ..the correct way for standard concrete for footings is 6-3-1 BY WEIGHT not volume ..at one time in my life i worked as a bacher in a ready mixed plant ..i was the guy who mixed the concrete ..and every thing had to be weighed ..so its 6 of gravel 3 of sharp sand and one of cement ..a shovel of sand or gravel weighs a lot more than a shovel of cement ..
2007-09-24 03:29:39
·
answer #2
·
answered by boy boy 7
·
0⤊
0⤋
Concrete is in the Verhältniss 3 normal: 1 mixed, three shovels sand and a shovel cement
2007-09-23 23:46:17
·
answer #3
·
answered by Anonymous
·
2⤊
1⤋
I don't know. I use the concrete that comes in the bag where you just add water.
2007-09-27 16:43:36
·
answer #4
·
answered by sophieb 7
·
0⤊
0⤋
4 shovels of gravel
2 shovels of sand
1 shovel of cement
and feb mix if you want
2007-09-23 22:05:23
·
answer #5
·
answered by antonia 2
·
1⤊
1⤋
3 ballest
1 cement.
2007-09-23 22:11:44
·
answer #6
·
answered by AnnieG 4
·
0⤊
1⤋
6 aggregate to 1 cement plus enough water to make it workable
2007-09-23 22:03:59
·
answer #7
·
answered by alex s 5
·
0⤊
3⤋
one of cement two of sand, add a squirt of washing up liquid
2007-09-23 22:03:11
·
answer #8
·
answered by ufo18 4
·
0⤊
2⤋