Are you talking about the operating engineer
for a completed building, or the design team
for a new building?
The operating engineer needs complete operating
parameters, plans, and diagrams for all systems,
plus a building occupancy schedule.
The design team needs a complete description
of the building required, (generally the product
of an architect), and the parameters of it's intended use.
2007-09-07 09:30:56
·
answer #1
·
answered by Irv S 7
·
0⤊
0⤋
1. How tall the building want to be
2. the size n shape of building
3. where the building want to be, cause geotechnical condition is one important thing to know
2007-09-07 16:29:21
·
answer #2
·
answered by Tommy M 1
·
0⤊
0⤋
He should ask for the geotech report. The foundation design is very important.
2007-09-07 14:31:47
·
answer #3
·
answered by stone w 2
·
0⤊
0⤋
If it has a runway for boeings to land.
2007-09-07 12:08:42
·
answer #4
·
answered by Anonymous
·
0⤊
0⤋
how tall do you want it to be?
2007-09-07 12:08:24
·
answer #5
·
answered by Anonymous
·
0⤊