A power unit is there by the bank of the river of 900 mtr width. a cable is made from power unit to power a plant opposite to that of the river and 3000 mtr away from the power unit. The cost of the cable bellows water Rs5 / mtr and cost of cable on the bank is Rs 4/ mtr. Find the pt where the cable cut through the river.
1.2800
2. 3000
3. 2100
4.3900
pls say the approach of solving the problem