Seal of approval from quality control rubber stamping machine.
In a goods manufacturing factory, non-defective goods after being checked by quality control personnels have to go through this station for stamp of approval. This machine will just give a stamp of 'QC Approval' initial before going to the warehouse.
The expected outcome is to show the goods have gone through quality control station and is approved.
This is my final year project for my diploma in Mechanical Engineering.
I hope can get some advices from all of you especially engineer of related field.
Thank you very much

2006-12-05 17:54:41 · 2 answers · asked by cyvoonie87 1 in Science & Mathematics Engineering

2 answers

Rate of production is going to guide your equipment selection. Then you have to decide on a trigger (what makes the thing stamp?)

After that, you can get into details of machine design or selection (almost always better to buy and adapt then to invent...), controls, tooling and safety (in the States, this gizmo will have to be compliant with a number of safety specifications, depending on the type of equipment and triggering mechanism selected).

Good luck with it. This is typical of a "real" assignment that you might get in a plant or something.

2006-12-07 13:09:17 · answer #1 · answered by www.HaysEngineering.com 4 · 0 0