English Deutsch Français Italiano Español Português 繁體中文 Bahasa Indonesia Tiếng Việt ภาษาไทย
All categories

1 answers

A "simple" filling system would not need PLC control or a flow meter.
A 555 ic timing chip, a few switching components on a small circuit board and an electric solenoid valve on the supply.
If the flow and volume isn't consistent with time, add a float attached to a micro switch or an optical sensor to override the time setting.

2006-11-10 15:17:55 · answer #1 · answered by LeAnne 7 · 0 0

fedest.com, questions and answers