How do crane operators assemble tower cranes that reach the skylines of cities?

2006-11-01 06:30:55 · 5 answers · asked by cableguy 2 in Science & Mathematics Engineering

5 answers

first the inside control is put into place...then the first section of the outside is built...then, they use side jacks to lift the inside up to the next level, and so on til they reach their height goal..

2006-11-01 06:34:26 · answer #1 · answered by Anonymous · 0 0

London

2016-05-23 04:05:55 · answer #2 · answered by Anonymous · 0 0

Another crane lift the parts into place.

2006-11-01 06:32:41 · answer #3 · answered by Anonymous · 0 0

they build it on the actual building i think or next to it and it rises while the building becomes taller

2006-11-01 06:32:36 · answer #4 · answered by Alex 3 · 0 0

That's sound difficult.

2006-11-01 06:32:18 · answer #5 · answered by D.J 5 · 0 0