English Deutsch Français Italiano Español Português 繁體中文 Bahasa Indonesia Tiếng Việt ภาษาไทย
All categories

1 answers

The three levels of planning include outcast, or the live wire usables,
then overcasting, or the potential harvestable and makeable volts, and
finally the environ ions or protected electrons that are still converting(active).
When building any system to operated machinery the pollutant is the first
ideal system to gain control, using a waste area and polarity test to make
all fire proofing up to requirements. Test all lines at all possible options
to see where the volts go. The bargain volts are harnessable, that is
those due to natural rock or reaction chemistry in the site. All types of
fire and electrode predicted should be written in to the production design.
Making the volt controls is standardization of newest cable or reserves.

2006-10-18 16:58:35 · answer #1 · answered by mtvtoni 6 · 0 0

fedest.com, questions and answers