Our GE frame 9E gas turbine load has decreased since the start up after the major outage.Main factor seems to be high humidity which is running more than 60% now a days.Ambient temperature vary from 22ºC to 36ºC.We have three gas turine of 130MW each.Load at GTA/B/C is 119MW/113MW/115MW respectively at 26ºC ambient temp at 63% humidiy.GTA OFF line water wash carried out a week ago.GTC OFF line water wash carried out a month ago.GTB not washed since start up.