In 4 hrs 21 parts
So,
In 1 hour 4x=21
x=21/4 = 5.25
So, no. of parts made in 7 hours is equal to the no. of parts made in one our multiplied by 7.....!
That is,
= 5.25x 7
= 36.75 parts
2006-09-29 00:17:56
·
answer #1
·
answered by Nikki 2
·
0⤊
0⤋
Yes 36.75.
In 4 hrs 21 parts
In 1 hour 4x=21
x=21/4 = 5.25
in 7 hrs= 5.25x 7
= 36.75
2006-09-28 18:49:53
·
answer #2
·
answered by observer 4
·
0⤊
0⤋
Mathematically the answer is 36.75, but really it depends on the location of the worker. Employees in the EU are allowed to take breaks of 20 mins every four hours worked. So it will be slightly less.
If you are talking about a worker in a sweatshop in China, Vietnam, Cambodia, Mexico or Korea, it will be the full figure of 36.75 or realistically 36.
However, going by the name of the employee, "Frank" cannot be an Asian or a Latin American, and hence should be of USA or EU origin. So the figure is less than 36.
2006-09-28 18:55:11
·
answer #3
·
answered by Calculus 5
·
0⤊
1⤋
21 divided by 4 (5.25) times 7 equals 36.75
So he will have made 36 parts and be three quarters done on the 37th part.
2006-09-28 18:46:37
·
answer #4
·
answered by JaneB 7
·
0⤊
0⤋
21/4=5.25 parts/hr
in 7 hrs
5.25*7=36.75
Since there can't be a fractional part, the answer is 36
2006-10-02 16:06:32
·
answer #5
·
answered by yupchagee 7
·
0⤊
0⤋
proportion is
4:21::7:x
4x=147
x=147/4=36.75 parts
2006-09-28 18:48:40
·
answer #6
·
answered by raj 7
·
0⤊
0⤋
36.75
2006-09-28 18:47:47
·
answer #7
·
answered by the wise one 3
·
0⤊
0⤋