They're on the way!
Journey times in Kent are to be cut by half with domestic services on the CTRL.
As for people who don't want to pay for it, then your only option not to pay for it is not to use train services in Kent as all ticket prices are to be raised next year with a levy to go towards the high speed domestic CTRL services.
2006-08-25 10:18:30
·
answer #1
·
answered by Anonymous
·
0⤊
0⤋
People have mentioned at length about crap infrastructure and the like. Places like Japan and France invest heavily in their railways - look at the dedicated routes across France they have built for the TGV since 1981 - astonishing. Those that say we don't need railways are talking utter rubbish. We need the railways, they're essential to our economy and the road system could never cope if we transported everything this way. We do have high speed trains in this country - the East Coast Main Line, the West Coast Main Line and the Great Western route as far as Exeter where running is 125 mph almost throughout. Remember too that the high speed link aross Kent is now complete and trains are running towards the channel tunnel at 180mph!! The railways are getting better but there are too many people who still laugh at the old jokes about BR sandwiches and late trains - it's boring!! The railways are not perfect and there is still a way to go but give the railways a break.
2006-08-24 02:15:07
·
answer #2
·
answered by Anonymous
·
2⤊
0⤋
No, they are on the way, UK railway is also moving step forward to get more high speed trains in the future.Recently hear that Euro-star, the high-speed train company connecting London with Brussels and Paris, has just upped its game.It is capable of carrying more than 900 passengers as a result of the 20% capacity boost given to it. On Thursday, the company unveiled its new e320 train at London's St. Pancras Station.
2015-03-04 15:34:48
·
answer #3
·
answered by nag 3
·
0⤊
0⤋
even as Railtrack became charged with upgrading the West Coast Mail Line the envisioned cost became £3 billion..this went over funds through 10 situations. This became mainly because contractors and sub-contractors observed a danger to over cost and take their time doing issues. BR being extra conscious than Railtrack about budgets would have saved a tighter grip on funds and an extremely good severe % railway would were outfitted. I belive that a nationalised equipment could be put in position to end the profiteering thats stripped the governments railway budgets contained in the previous few years. prepare operating organizations are overcharging the passengers purely to pay huge dividends to shreholders. this is only a pity that the full needed Railway equipment became closed contained in the 1960's. this would were used to provide amenities to the significant northern cities in the course of the WCML rebuild, which will were close thoroughly till complete,(the significant reason the WCML took see you later became it became required to nevertheless grant amenities in the course of the re-construct). The proposed HS2 line to the north will be a political "warm potato"..middle England will hate it ruining the nation-state...and finally the dimensions of the equipment will be decreased via authorities decrease backs. immediately the present authorities is having a seem at how the railways of england are funded. Its envisioned that funding will be decrease back on gently used lines(per chance closed?). Given a determination of HS2 or community lines which matches to get universal help?
2016-12-01 01:24:18
·
answer #4
·
answered by ? 4
·
0⤊
0⤋
We have one of the safest rail records in the world. We have trains that can run at 150 mph in someparts of the UK....much faster than most other countries around the world. Yes, France TGV, Germany ICE trains, Japan etc can offer trains with higher speeds but these are built specifically to travel huge distances..we just dont have those sort of mileages to travel in Uk or the investment to build purpose built dedicated lines. Local services from LLanelli are just that, local trains with a max speed of 90mph. You may be lucky and get the early morning HST service which is quicker but in the whole i reckon our rail system does a pretty good job considering decades of underinvestment and a stupid bloody government who privatised it!!!!!
2006-08-24 06:44:33
·
answer #5
·
answered by Lone Wolf 2
·
0⤊
0⤋
we do have high speed trains.. 150 mph+ on the east/west coast mainline..... i think 4 hours from llanelli to london is wrong, its quicker than that, maybe you travelled when there was engineering work... the reason france has 200mph trains is because it is so flat and open there, they can install the lines.. we are much more densly populated here opposed to there.... some of your answerers are totally wrong... we have currently some of the safest,most reliable trains in the world.. look at south-west trains, 99% punctuality lately.... for example... the french etc, don't have the problems with vandalism and plonkers running about on the track, and trying to beat the level crossing lights... if we could stop that nonsence, we could up the speeds.......
2006-08-24 01:53:01
·
answer #6
·
answered by paulrb8 7
·
2⤊
0⤋
A really simple answer - lack of monetary investment! And if you want really slow, try getting from Penzance to London...
The UK has not built any dedicated high speed lines. All British high speed trains run on tracks that were laid over 100 years ago, at a time where trains went a lot more slowly and relatively tight curves appeared a lot on mainlines. It is simply not possible to run at speed down a track with tight curves, it is uncomfortable and dangerous, trains have to slow down to go round the curve and speed up, but by the time they have speeded up there is a new curve. This is why high speed lines have been built in Europe to get around this problem, but Britain has not followed and there are no high speed lines in the UK.
2006-08-22 23:17:32
·
answer #7
·
answered by marzipanthecat 3
·
1⤊
1⤋
Because it is not necessary!
The real problem is that the British Fascits{all governements of this country who gave priority to individual transport}stopped the rail developpment by closing half the network and ending the realisation of the lines projected before WW I -II.So this is the main reason this nation decayed ;they abandonned progress [what makes an advanced civilisation is the Rail not General Motors]passing from First World to Fourth .
2006-08-24 09:19:22
·
answer #8
·
answered by Meien-duc 5
·
0⤊
0⤋
The government doesn't like the costs of new rail projects, but also in Europe there are lots of unpopulated open spaces where a high speed route can be laid without too much opposition. There is no similar unoccupied land in the UK so a new line would be so much more expensive then in Europe. even so the Channel Tunnel rail link is being constructed and domestic high speed services should start in 2008.
2006-08-23 04:55:23
·
answer #9
·
answered by Anonymous
·
3⤊
0⤋
The west coast main line (which links many of the main cities in the UK) is currently being upgraded at a cost of £2billion. To upgrade all lines to this standard would be uneconomical and impractical. The UK is quite small and compact and there are not the distances between stations to accelerate to high speeds and decelerate safely.
2006-08-22 23:23:17
·
answer #10
·
answered by martpd 2
·
1⤊
1⤋