well, i'm not sure if she's in love with you but one thing is for sure you're the one whose inlove with her!
2006-07-12 22:03:39
·
answer #1
·
answered by HisAngel 2
·
7⤊
2⤋
well,all the details u mentioned are about your feelings for her,you have asked the wrong question.
its all about how you feel about her n you are surely in love with her but sorry cant same the same about her!!
2006-07-13 04:49:27
·
answer #2
·
answered by country_girl 5
·
0⤊
0⤋
1st improve your english
2nd ur crazy
3rd she's playing wth u
2006-07-13 04:46:01
·
answer #3
·
answered by Neozerox 3
·
0⤊
0⤋
You lack maturity in this, let her go, if she is yours she will come back
2006-07-13 04:49:00
·
answer #4
·
answered by theKenyan 3
·
0⤊
0⤋
You sound like your stalking her.
sorry.
2006-07-13 04:45:16
·
answer #5
·
answered by Anonymous
·
0⤊
0⤋
you should ask her if she feels something for you !
2006-07-13 04:46:11
·
answer #6
·
answered by Anonymous
·
0⤊
0⤋
be affirmative with her, ask her what she wants
2006-07-13 04:45:20
·
answer #7
·
answered by gallow 5
·
0⤊
0⤋
you're crazy about her.
2006-07-13 04:43:23
·
answer #8
·
answered by Anonymous
·
0⤊
0⤋
1.Contractor and/or Owner should execute all CIVIL & ELECTRICAL works regarding AC.
2.Contractor and/or Owner Should Provide TUBE between the THERMOSTAT and the INDOOR unit.
3.Contractor and/or Owner should provide three Phase ELECTRICAL CONNECTIONS with 32 AMP ISOLATER next to outdoor unit, and single phase with socket next to indoor unit.
4.Contractor and/or Owner should provide WOODEN FRAME and STEEL FRAME (Sleeves) wherever they needed, either between floors or rooms.
5.Contractor and/or Owner should provide CONCRETE BASE for the OUTDOOR unit where it shown in drawing.
6.Contractor and/or Owner should provide Labor/Winch to LIFT the OUTDOOR units & INDOOR units to where they should be installed.
7.Contractor and/or Owner should provide the needed DRAIN PIPES to the nearest drain point; the pipe should not be less than ¾”.
8.Contractor and/or Owner should provide HOLES either in CONCRETE or in CEMENT BLOCK wherever needed or as shown in drawings.
9.Contractor and/or Owner should provide SCAFOLDINGS where needed in SHAFT(s).
10.Contractor and/or Owner should provide ELECTRICITY where needed in site.
11.Contractor and/or Owner should CLOSE any remains unneeded OPENINGS and HOLES around ductwork, copper pipes and drain pipes.
1.Contractor and/or Owner should execute all CIVIL & ELECTRICAL works regarding AC.
2.Contractor and/or Owner Should Provide TUBE between the THERMOSTAT and the INDOOR unit.
3.Contractor and/or Owner should provide three Phase ELECTRICAL CONNECTIONS with 32 AMP ISOLATER next to outdoor unit, and single phase with socket next to indoor unit.
4.Contractor and/or Owner should provide WOODEN FRAME and STEEL FRAME (Sleeves) wherever they needed, either between floors or rooms.
5.Contractor and/or Owner should provide CONCRETE BASE for the OUTDOOR unit where it shown in drawing.
6.Contractor and/or Owner should provide Labor/Winch to LIFT the OUTDOOR units & INDOOR units to where they should be installed.
7.Contractor and/or Owner should provide the needed DRAIN PIPES to the nearest drain point; the pipe should not be less than ¾”.
8.Contractor and/or Owner should provide HOLES either in CONCRETE or in CEMENT BLOCK wherever needed or as shown in drawings.
9.Contractor and/or Owner should provide SCAFOLDINGS where needed in SHAFT(s).
10.Contractor and/or Owner should provide ELECTRICITY where needed in site.
11.Contractor and/or Owner should CLOSE any remains unneeded OPENINGS and HOLES around ductwork, copper pipes and drain pipes.
1.Contractor and/or Owner should execute all CIVIL & ELECTRICAL works regarding AC.
2.Contractor and/or Owner Should Provide TUBE between the THERMOSTAT and the INDOOR unit.
3.Contractor and/or Owner should provide three Phase ELECTRICAL CONNECTIONS with 32 AMP ISOLATER next to outdoor unit, and single phase with socket next to indoor unit.
4.Contractor and/or Owner should provide WOODEN FRAME and STEEL FRAME (Sleeves) wherever they needed, either between floors or rooms.
5.Contractor and/or Owner should provide CONCRETE BASE for the OUTDOOR unit where it shown in drawing.
6.Contractor and/or Owner should provide Labor/Winch to LIFT the OUTDOOR units & INDOOR units to where they should be installed.
7.Contractor and/or Owner should provide the needed DRAIN PIPES to the nearest drain point; the pipe should not be less than ¾”.
8.Contractor and/or Owner should provide HOLES either in CONCRETE or in CEMENT BLOCK wherever needed or as shown in drawings.
9.Contractor and/or Owner should provide SCAFOLDINGS where needed in SHAFT(s).
10.Contractor and/or Owner should provide ELECTRICITY where needed in site.
11.Contractor and/or Owner should CLOSE any remains unneeded OPENINGS and HOLES around ductwork, copper pipes and drain pipes.
2006-07-13 04:56:02
·
answer #9
·
answered by ONE 3
·
0⤊
2⤋