English Deutsch Français Italiano Español Português 繁體中文 Bahasa Indonesia Tiếng Việt ภาษาไทย
All categories

11 answers

Let X = area to be washed.
____________Monica_____Bill
Work rate_____X________X/2

Working together work they clean (3/2)X in 1 hour

(3/2) X<---> 1 hour
X<--------->X / (3/2)(X) hour = 2/3 hour
It will take them 40 min

2007-10-19 19:55:52 · answer #1 · answered by Como 7 · 0 0

monica can do 1 car per hour
bill can do 1/2 a car per hour

so together they can do 1 and a half cars per hour
or 3/2 cars/hour

so (1 car)/ (3/2 cars/hour)= 2/3 hour.

Together they can wash a car in 2/3 hour.

or 2/3 hours * 60 min/hour= 40 minutes

2007-10-20 01:13:39 · answer #2 · answered by zenock 4 · 0 0

Let x be the part of the job done

x/1 + x/2 = 1
(3/2)x = 1
x = 2/3

it will take them 40 minutes to wash one car

2007-10-20 01:12:18 · answer #3 · answered by rEi 3 · 0 0

Bill's rate is 1/(2 hr/car) or .5 car/hour
Monica's rate = 1 car/hour

Monica + Bill rate together = 1 car/hour + .5 car/hour
= 1.5 car/hour

Rate (Time) = # of cars washed

1.5 car/hr (time) = 1 car Divide both sides by 1.5
time = 1 car / (1.5car/hr)
time = .666666667 hours

Convert to Minutes
= .666666667 hours (60 minutes/hour)
= 40 minutes ANSWER

2007-10-20 01:11:00 · answer #4 · answered by r r 5 · 1 0

1/1 + 1/2 = 1/x where x = time for both doing this together
3/2 = 1/x
3x = 2
x = 2/3 hr

2007-10-20 01:12:56 · answer #5 · answered by duffy 4 · 0 0

40 minutes

2007-10-20 01:11:17 · answer #6 · answered by Anonymous · 0 0

tell them to both wash 1 car and time them.

2007-10-20 02:51:27 · answer #7 · answered by seaniquanzo 2 · 0 0

40 minutes.

2007-10-20 01:12:14 · answer #8 · answered by crazyramsfan 1 · 0 0

2 hours...Why would Monica wash the car when she can get Bill to do it???? Silly Rabbit!!!!

2007-10-20 01:08:48 · answer #9 · answered by imshorty 2 · 1 1

If they are washing at the same time, two hours.

2007-10-20 01:07:53 · answer #10 · answered by Nicole L 3 · 0 1

fedest.com, questions and answers