English Deutsch Français Italiano Español Português 繁體中文 Bahasa Indonesia Tiếng Việt ภาษาไทย
All categories

1.calculate the speed of the bob at the next-to-last spark mark and
2.the d/t for the bob at the last spark mark
3.calculate the uncertainty in the d/t value for the last visible point

Using diagram
http://img524.imageshack.us/my.php?image=bobxt8.jpg

2007-09-24 13:37:53 · 1 answers · asked by Anonymous in Science & Mathematics Physics

1 answers

I get
y(t)=450*t^2-3.75*t inches as the best fit to the data
and v(t)=900*t-3.75 inches/second

Looking at just the next to last and point previous to that
the average speed between is 101.25 in/sec
calculated is also 101.25 using the times and v(t)

at the last point it is146.25 in/sec
j

2007-09-25 06:41:21 · answer #1 · answered by odu83 7 · 0 0

fedest.com, questions and answers