Say 3" is 75mm so 10x.075 = 0.75 cubic metre of screed. Then depends on what ratio of sand and cement.

A ton bag of sand is approx 1 cubic metre which would take 8 25kg bags of cement to do a 1c:4s.

I would say 750kg sand to 6 x 25kg bags of cement

750kg sand to 5 bags cement for 1c:5s
750kg sand to 4 bags cement for 1c:6s

2007-09-17 09:36:56 · answer #1 · answered by Anonymous · 1 0

Volume = Length x Width x depth (using the same units ie.metres. Convert 3" to metres = approx. 7 1/2 cm = .075m

5 m x 2 m x .075
10 x .075 = .75 cubic metres ie. 3/4 of a metre cubed.

Your mix should be 1 part cement, 3 parts sand and 2 parts stone. This is a normal mix for a cement floor.

2007-09-16 09:35:25 · answer #2 · answered by Anonymous · 2 1

1 X cu meter of fine washed sharp sand, 7 X 25kg cement.

2007-09-17 13:13:13 · answer #3 · answered by Techno 7 · 0 0

about a metre3 of sharp sand and 5 bags of cement.
actually they've cut the size of a bag of dust haven't they, maybe 11 bags just in case. old habits die hard.
ask in the builders merchants they'll advise you.

2007-09-17 11:12:07 · answer #4 · answered by crazy_gang1843 3 · 0 0

15 bags of concrete mix 25kg bags

2007-09-16 18:07:39 · answer #5 · answered by Anonymous · 0 3

Why mix metric & imperial

2007-09-16 15:17:27 · answer #6 · answered by joe n 1 · 1 2

? is too open need more info, do you mean 3 inches deep ? over how large of an area ?

2007-09-16 09:23:41 · answer #7 · answered by William B 7 · 0 4