Yes. Fences = rate x time. Pat's fences = pat's rate x pat's time, so 1 = pat's rate x 2, so pat's rate = 1/2 fence per hour. Jill's fences = jill's rate x jill's time, so 1 = jill's rate x 3, so jill's rate = 1/3 fence per hour. Combining the rates, you get 1/2 + 1/3 = 5/6 fence per hour. 1 fence = 5/6 fences per hour x combined time, which is 6/5, which is 1 and 1/5 hour, which is 1 hour and 12 minutes.
There are other ways to do this but I took the dimensional analysis route.
2007-08-24 19:38:08
·
answer #1
·
answered by fenchurchthesane 6
·
0⤊
1⤋
pat paints a fence in 2 hrs, then in 1hr he can paint 1/2 of the fence. Samething with Jill, in 1hr, she can paint 1/3 of the fence.
Let t be the time it takes them to paint the fence together
(1/2)t + (1/3)t = 1
(5/6)t = 1
t = 1.2 hr or 1hr and 12min
you are correct!
2007-08-24 19:32:10
·
answer #2
·
answered by 7
·
0⤊
1⤋
work done by pat in 1 hr = 1/2
work done by jill in 1 hr = 1/3
if they do together then in 1 hour they do
1/2+1/3 = 5/6 of the work
now
5/6 work is done in 1 hour
so 6/6 =1 work is done in 6/5 * 1=6/5 hours
=1.2 hours
2007-08-24 19:33:43
·
answer #3
·
answered by sweet n simple 5
·
0⤊
1⤋
work finished in one hour
x = 1 work
1/2 x+ 1/3x = 5/6X
so they can do 5/6 of the job in hour
5/6 of X per hour
to finished the job
t = X/ rate
t = x/(5/6x)
t = 6/5 hour
1hr 12 min
2007-08-24 19:36:43
·
answer #4
·
answered by dbondocoy@yahoo.com 3
·
0⤊
1⤋
It will take them 1.2 hours to paint the fence together, or 1 hr 12 minutes.
Yes you are right.
2007-08-24 19:32:24
·
answer #5
·
answered by swd 6
·
0⤊
1⤋
only for the reason which you're dilated or the toddler is extremely low, does no longer mean hard artwork is going to ensue every time quickly. you are able to be a million or 2 cms dilated for a month or they might verify you and allow you to already know your 10cm already and deliver you to the well-being facility. incredibly the only indication that tough artwork is going to ensue is while and in the experience that your water breaks. even in the experience that your water breaks, there is not any reality that tough artwork will ensue even that very same day. I asked my well-being practitioner while i replaced into pregnant and that i instructed her to be thoroughly undemanding. She instructed me that the well-being practitioner incredibly has no way of understanding while hard artwork is going to ensue or perhaps your due date is basically a guideline. My due date replaced into Sept. 12, 2009. I went in at my 38 week appointment and replaced right into a million cm dilated, so it although ok it incredibly is progressing properly. Went in for my thirty ninth week appt. and replaced into nonetheless basically a million cm. Went in for my fortieth week appt, and nonetheless no longer something. Went decrease back 2 days later and had a nonstress try to toddler nonetheless replaced into no longer waiting. 5 days after my due date i replaced into brought on after progressing to basically 1cm by using the entire hard artwork technique. I had contractions yet no longer the rest ever exceeded off.
2016-10-16 22:26:18
·
answer #6
·
answered by ? 4
·
0⤊
0⤋
the workin is like this:
(a*b)/(a+b)
(2*3)(2+3)
6/5hours
1 hour and 12 minutes
yes , you're right
2007-08-24 19:31:34
·
answer #7
·
answered by **PiNoY YFC** 7
·
0⤊
1⤋
it's 1 hour 12 miniutes your right
2007-08-24 19:32:24
·
answer #8
·
answered by ashif_noohu 2
·
0⤊
1⤋
less than an hour or 50 mins
2007-08-24 19:34:43
·
answer #9
·
answered by darcey 3
·
0⤊
2⤋
YES !!! i suppose u'r just wasting 5 pts for this sice u are smart...
2007-08-24 21:09:12
·
answer #10
·
answered by Anonymous
·
0⤊
2⤋