Rebar would be left long enough to tie to for the next pour of a detached garage.

2007-08-18 13:31:14 · 3 answers · asked by Joe Kerry 1 in Home & Garden Do It Yourself (DIY)

3 answers

Make a lap joint about 2' long and embed short vertical rebars spaced 6" apart. Be sure to add at least 6" depth to the first pour at the overlap.

2007-08-18 14:02:02 · answer #1 · answered by billy brite 6 · 0 0

a cold joint is never a good idea but it is done all the time when it cant be helped. as long as you let the re-bar hang out you should be okay...

2007-08-19 01:36:47 · answer #2 · answered by Anonymous · 0 0

only if its not in a load bearing area,

2007-08-18 13:41:04 · answer #3 · answered by William B 7 · 0 0