5 hours for 3 typists

You set up the equation like this:

3 typists * 5 hours = 8 typists * x hours

15 = 8x
x = 1.875 hours

2007-06-16 06:21:28 · answer #1 · answered by Lilovacookedrice 3 · 2 0

assuming all typists type at the same speed...

3 typists take 5 hours to type a set of letters
each typists produces 1/3 of a set of letters in five hours
in an hour, each typist produces 1/15 of a set of letters
8 typists would produce 8/15 of a set of letters in an hour
it would require another 7/8 of an hour (52.5 minutes) to produce the rest of the set of letters

total time: 1 hour, 52.5 minutes

2007-06-16 13:27:33 · answer #2 · answered by jimbob 6 · 0 0

It would take one typist 15 hours to do the letters, so it would take 8 typists 15/8 hours.

2007-06-16 13:25:37 · answer #3 · answered by Anonymous · 1 0

One typist would take 15 hours.
Therefore each typist would do 1/15th of the job each hour.
8 typists would do 8/15ths of the job per hour
8/15 Job = 1 hour
Job = 15/8 hour(s)
Job = 1 7/8 hours = 1 hour 52.5 minutes.

2007-06-16 13:24:01 · answer #4 · answered by Mike1942f 7 · 1 0

Typists Hours
3 5
1 15
8 15/8=1.875

So it would take 1.875h / 1h, 52 min and 30sec to type the letters.

2007-06-17 09:22:49 · answer #5 · answered by Amethyst Cherry W 3 · 0 0

thats 15 typist-hours, so 8 typists will use 1.875 hours or 1 hour, 52 minutes, and 30 seconds

2007-06-16 13:22:00 · answer #6 · answered by greydeath212 2 · 1 0

5 hours * 3 typists = 15 typist-hours

15 typist-hours / 8 typists = 1.875 hours = 112.5 minutes

2007-06-16 13:21:15 · answer #7 · answered by Adam H 1 · 2 1

5 multiplied by 3 = 15

8 multiplied by x = 15

x = 15/8 (a little less than 2) hours.

2007-06-16 13:23:20 · answer #8 · answered by Swamy 7 · 1 0

5 Hours X 3/8 = 1Hr 52.5 min

2007-06-16 13:24:54 · answer #9 · answered by Joymash 6 · 1 0