1. a lever is used to lift a 45 N rock. the applied force is 75 N.
2. a pulley system raises a 39 N log with an applied force of 45 N.
3. you do 425 J of work to push a 75 N box up a ramp until the box is 2.5 m above the ground

2007-04-21 03:02:31 · 2 answers · asked by Anonymous in Science & Mathematics Chemistry

2 answers

To calculate effciencey you need to use:
Eff = work out / work in

2007-04-21 03:23:47 · answer #1 · answered by physandchemteach 7 · 0 0

1. Efficiency = (work done by machine/ actual work done by machine) *100%= (45/75)*100= 60%

2) Efficiency= (39/45)*100% = 86.67%

3)Efficiency = (75*2.5/425)*100 = 44.12%

2007-04-21 03:28:31 · answer #2 · answered by The exclamation mark 6 · 0 0