English Deutsch Français Italiano Español Português 繁體中文 Bahasa Indonesia Tiếng Việt ภาษาไทย
All categories

The base of the incline is 4.0m and the height of the incline is 3.0m.

How much work must be done against gravity to move the block to the top of the incline?

a. 10 J
b. 60 J
c. 80 J
d. 100 J

2007-04-01 13:26:16 · 3 answers · asked by Anonymous in Science & Mathematics Physics

3 answers

B = 60 J

2007-04-01 13:31:09 · answer #1 · answered by Thomas C 6 · 0 0

the work = 20*3=60 J as 20 N = m*g
The base date is not needed as the work done equals the potential energy gane becaus e the incline is frictionless

2007-04-01 13:35:34 · answer #2 · answered by santmann2002 7 · 0 0

Conserving energy you get
Work done=mgh=20*3=60
ans = b. 60J

2007-04-01 13:31:58 · answer #3 · answered by Saurabh 1 · 0 0

fedest.com, questions and answers