My backyard slants a little bit, so one end is a foot or two higher than the other. I plan to build it in terraced segments so that I don't wind up with it really deep on the low end. I will use sand and a level to ensure that each bottom row paver is level and secure. The question is... should I start at the low end of the yard (that's what my gut instinct tells me) or should I start at the high end of the yard?