English Deutsch Français Italiano Español Português 繁體中文 Bahasa Indonesia Tiếng Việt ภาษาไทย
All categories

1 answers

My son built a halfpipe for my grandson it cost $1800 in material
( using treated lumber), plus using marine varnish on the whole thing ( the varnish was what cost so much--he applied 4 layers). Seem to me it was about 25' x16' wide for the skateboards. On the sides, the 25' way, it was built into storage areas.
[U] , < see the sides, it kept kids' toys and other small stuff out of the rain.

2007-02-28 04:41:20 · answer #1 · answered by LINDA D. 5 · 0 0

fedest.com, questions and answers