Framing,roofing,siding,doors and windows(lockable) leaving utilities and inside finishing.
2007-02-23 21:26:01
·
answer #1
·
answered by sgthaw 2
·
1⤊
0⤋
When the 60% work is done in all respect
2007-02-23 21:24:35
·
answer #2
·
answered by khuranapvp 3
·
0⤊
0⤋
Completed structure, just before plastering.
2007-02-23 21:22:10
·
answer #3
·
answered by Expression 5
·
0⤊
0⤋
House is weather tite.
2007-02-23 21:46:04
·
answer #4
·
answered by breezyburgee 4
·
1⤊
0⤋
after drywall but before mud and tape.
2007-02-24 02:51:25
·
answer #5
·
answered by ata31254 3
·
0⤊
0⤋
when the insalation is installed.and the siding is on
2007-02-24 06:36:14
·
answer #6
·
answered by schuety1 1
·
0⤊
0⤋
when its wind and water tight
2007-02-24 02:59:43
·
answer #7
·
answered by Kenny M 2
·