7 answers

Framing,roofing,siding,doors and windows(lockable) leaving utilities and inside finishing.

2007-02-23 21:26:01 · answer #1 · answered by sgthaw 2 · 1 0

When the 60% work is done in all respect

2007-02-23 21:24:35 · answer #2 · answered by khuranapvp 3 · 0 0

Completed structure, just before plastering.

2007-02-23 21:22:10 · answer #3 · answered by Expression 5 · 0 0

House is weather tite.

2007-02-23 21:46:04 · answer #4 · answered by breezyburgee 4 · 1 0

after drywall but before mud and tape.

2007-02-24 02:51:25 · answer #5 · answered by ata31254 3 · 0 0

when the insalation is installed.and the siding is on

2007-02-24 06:36:14 · answer #6 · answered by schuety1 1 · 0 0

when its wind and water tight

2007-02-24 02:59:43 · answer #7 · answered by Kenny M 2 · 0 0