English Deutsch Français Italiano Español Português 繁體中文 Bahasa Indonesia Tiếng Việt ภาษาไทย
All categories

Ok i got the first part of this question but i can't figure out the second part...help!

In raising a 4600 N piano with a pulley system, the workers note that for every 2 m of rope pulled down, the piano rises 0.2 m. Ideally, how much force is required to lift the piano?
460 N(got that)

now...
(b) If the workers actually pull with 2500 N of force to lift the piano, what is the efficiency of the pulley system?

2007-02-18 14:08:32 · 2 answers · asked by Jane A 3 in Science & Mathematics Physics

2 answers

Efficiency = (Work out) / (Work in)

Work = F*d

So

Efficiency = (4600N*0.2m)/(2500N*2m) =18.4%

2007-02-18 14:15:00 · answer #1 · answered by Dennis H 4 · 0 0

efficiancy is the ratio of paintings (or capability) out while in comparison with paintings put in. ability is measured in watts = J/s. ability score ( enter) = 1200W output = 80% of 1200 so capability wasted is 20% 20% = 0.2 0.2 x 1200 = 240J/s used for 30 minutes = 30 x 60 seconds complete capability wasted = 30 x 60 x 240 j

2016-11-23 17:42:40 · answer #2 · answered by ? 4 · 0 0

fedest.com, questions and answers