I would like to remove a load bearing wall in the basement of my two story house. Cut 2x10 floor joists are now supported by this wall. On one side, the room area is 138sqft (2x10's are 10'10'' long), on the other, the room area is 96sqft (2x10's are 7'6" long). The unsupported span of the beam will be 10'8". What size LVL or Parallam do I need?. What is the best way to support the ceiling during wall removal and beam installation? Is there something I can rent to avoid building temporary walls?
Thanks!
2006-12-28
10:50:59
·
1 answers
·
asked by
wonderman
1
in
Home & Garden
➔ Other - Home & Garden