I have a 100 year old New England Cottage style home where the floor sags on the 2nd floor but not the 1st floor. How do I fix this?

2006-12-07 01:35:31 · 4 answers · asked by joquito 2 in Home & Garden Maintenance & Repairs

4 answers

sounds like they may have used undersized floor joists in construction. If the first floor ceiling has an opening or maybe a peep hole you maybe can see how wide the boards are. If they are 4 or 5 inches wide then they are undersized. solution is to either remove the ceiling and reinforce the upper floor. Messy.
Or support the floor from below the ceiling with a joist running the length of the room with supports at the ends or maybe the moiddle depending on the height of the ceiling and the lengh of the run. Find an engineer.

2006-12-07 01:44:17 · answer #1 · answered by zocko 5 · 0 0

100 YEARS OLD IS KIND OF LIKE US, WE SAG AS THE YEARS GO BY. ARE THERE WEIGHT BEARING WALL IN THE MIDDLE OF THE SECOND FLOOR? OVER THE YEARS THE WEIGHT SETTLEMENT IS EVIDENT. IF NO TO THE ABOVE QUESTION THERE IS TWO WAY. 1/ U CAN JACK UP THE CEILING ON THE FIRST FLOOR AND BRACE, THIS WILL TAKE THE STRESS OFF THE UPPER FLOOR JOISTING. MAKE SURE U HAVE SUFFICIENT BRACING ON THE FIRST FLOOR OR U WILL SAG THE FIRST FLOOR DOWN. LET THE JACKED UP BRACING TO SET FOR A WEEK. 2/ GO TO THE SECOND FLOOR REMOVE FLOORING AND NAIL ADDITIONAL FLOOR JOISTS TO THE EXISTING ONE USING SOME CARPENTER GLUE AND NAIL THEM TOGETHER. USE LAGS SCREWS LONG ENOUGH TO PENETRAT BOTH JOIST. LET IT SET FOR 24 HOURS SO THE GLUE WILL DRY.
THEN REPLACE THE FLOORING AND REMOVE LOWER BRACING.
ANOTHER WAY IS TO REMOVE THE CEILING SHEET ROCK AND JACK UP AS DESCRIBED EARLIER AND USE 1/4" PLATE METAL AND LAG SCREW INTO THE EXISTING JOIST..

2006-12-07 01:55:28 · answer #2 · answered by john t 4 · 0 0

i will take a stab. once you extra the granite you extra plenty extra weight. so which you're able to desire to jack up (in basic terms sufficient to slip new in place, or you're able to crack the drywall and placed down in ultimate spot or doorways may well be out) and the two sister extra floor joists to present and look after mutually or upload extra in between present. persist with an identical technique and cloth (possibly 2x8 or 2x10) as replaced into used earlier. you're able to desire to place then interior an identical orientation and attractiveness as is there now, not throughout the time of because of the fact the burden needs to be carried over the completed floor. you're able to ask a contractor what their counseled action may well be with a unfastened estimate. optimistically you have a basement to get get admission to actual. wish this helps satisfied Halloween.

2016-12-11 04:03:01 · answer #3 · answered by Anonymous · 0 0

You are looking at a MAJOR job to perform the repair correctly. AND being that you are asking this question indicates you have little if any experience in this field.
Recommend you call a structual engineer in to examine the situation.

2006-12-07 01:46:20 · answer #4 · answered by LifeRyder 4 · 0 0