Half a hole IS a hole :-))
2006-11-29 23:22:38
·
answer #1
·
answered by zen 7
·
1⤊
0⤋
wow all the above answers are correct, in a sense, if you had to dig a 10 foot hole, 5 foot would be half, if it took a man a day (24 )hours to build a 10 foot hole, it would take hime 12 for half of that 10 foot hole,,,,
at same time, a hole is a hole, not a half,,,,,
2006-11-29 23:25:36
·
answer #2
·
answered by dlin333 7
·
0⤊
0⤋
2 days each man digs 1/5 of a hole each day, which equals 25%, so 2 days equals 50% you can dig half a hole if.... the size of the hole has specific specifications.
2016-05-23 04:36:28
·
answer #3
·
answered by Anonymous
·
0⤊
0⤋
It doesn't take Grassy long to get a little in the hole.
2006-11-29 23:28:23
·
answer #4
·
answered by Anonymous
·
0⤊
0⤋
12 hours
2006-11-29 23:23:38
·
answer #5
·
answered by Anonymous
·
0⤊
0⤋
12 hours
2006-11-29 23:22:30
·
answer #6
·
answered by jennifer g 7
·
1⤊
0⤋
6 days !
2006-11-29 23:24:29
·
answer #7
·
answered by Anonymous
·
0⤊
0⤋
There's no such thing as "half a hole"... A hole is a hole
2006-11-29 23:22:59
·
answer #8
·
answered by Anonymous
·
4⤊
0⤋
2 1/2 days...
2006-11-29 23:28:50
·
answer #9
·
answered by Tab 4
·
0⤊
0⤋
Zero days they get their woman to dig it for them
2006-11-29 23:23:29
·
answer #10
·
answered by Anonymous
·
0⤊
1⤋