3 answers

the cost is around 600 per sq ft. if you give it to the contractor
or else if you do i yourself you can finish it with around 500 Rs.
to 450 per sq ft.

2006-10-30 19:14:18 · answer #1 · answered by Raju K 2 · 0 1

The present rate if given to a contractor is ranging between Rs 600 to Rs 650 per square feet and this would not include the following Water Tank, Compound wall with gates,sump if any,electricity charges,water bore,approval cost ect.

Further the above mentioned rate is for standard materials like tiles costing Rs 25/- per sq ft, sanitary fixture cheapest models,anchor switches and sockets.

2006-10-31 03:36:10 · answer #2 · answered by Sudden 5 · 0 0

for normal house with standard materials and good labour workmanship, not too high and not too low activities like,flooring,doors, windows,kitchen equipments,bathroom tiles,sanitary fittings,plumbing works,drainage outlets,window gate and elevation grills.
elevation not deep hand work.
THE COST OF CONSTRUCTION IN CHENNAI IS Rs 550/ PER SQFT.
WATER AND ELECTRICITY FROM YOUR END.

2006-10-31 03:25:07 · answer #3 · answered by fahim c 1 · 0 0