No such thing as half a hole. It is still a hole no matter how deep/big it is!
2006-08-22 07:12:27
·
answer #1
·
answered by monkeyface 7
·
1⤊
0⤋
If 4 men dig a hole in 2 days a hole requires 8 man days of labor.
A half hole 4 man days. So 2 men would need to dig for 2 days.
2006-08-21 12:02:20
·
answer #2
·
answered by Kirk M 4
·
0⤊
2⤋
Two men dig a hole that is half of the size of the hole dug by four men in the same amount of time.
2006-08-21 13:43:35
·
answer #3
·
answered by Rebecca L 1
·
0⤊
1⤋
Half as many men (2 men), given the same amount of time (2 days) will do half as much work (half a hole). Therefore the answer is 2 days.
2006-08-22 02:33:03
·
answer #4
·
answered by SciFiGuy 2
·
0⤊
1⤋
4 men dig one hole in two days, 2 men digs half a hole in two days.
Its a matter of work -whether it a hole or half a hole.
So, total men required for digging a hole=4*2=8
So, total men required for digging half a hole=8/2=4. So,2 men can digging half a hole in 2 days.
2006-08-21 12:20:12
·
answer #5
·
answered by Anonymous
·
0⤊
2⤋
Ah man sure ya cant dig half a hole
2006-08-22 00:37:38
·
answer #6
·
answered by Anonymous
·
0⤊
0⤋
It's simple :
4men dig one hole in two days => 2men (=4/2) dig half hole (=1/2) in the same time = two days
so
2 men digs half a hole in two days.
2006-08-21 12:20:38
·
answer #7
·
answered by Samer EL SAWDA 2
·
0⤊
2⤋
You can't dig half a hole
2006-08-21 12:17:16
·
answer #8
·
answered by Adi_kakarot 2
·
1⤊
0⤋
You can't dig half a hole
2006-08-21 12:01:01
·
answer #9
·
answered by Monkeyphil 4
·
1⤊
0⤋
2 days.
4 men - 1 hole - 2 days,
so,
4 men - 1/2 hole - 1 day
2 men - 1/2 hole - 2 days
Only one variable can be changed at a time to make sense of it.
2006-08-22 07:54:12
·
answer #10
·
answered by Kemmy 6
·
0⤊
1⤋
They dont, You cant dig half a hole.
2006-08-21 12:01:10
·
answer #11
·
answered by Caffeine Fiend 4
·
1⤊
0⤋