I layed a floor with rmc fibre screed 10 months ago and tested it with a protometer. I got a moisture reading of about 19% is this ok? The floor has been washed over with a pva solution to supress the dust could this have retained some of the moisture?

2006-08-09 04:05:14 · 3 answers · asked by lenghtypeice 2 in Home & Garden Do It Yourself (DIY)

3 answers

Concrete will always take on moisture. That's the reason vapor barriers are used over them when installing finish flooring over them. 20% moisture is normal and fine. Do what you need to do next.

2006-08-09 04:11:53 · answer #1 · answered by Anonymous · 0 0

consistencey of mustard powder yes you should have waited until the screed had dried usually about 3 or 4 days

2006-08-09 04:10:44 · answer #2 · answered by cookedermott 6 · 0 0

it shouldn't be more than 5%
u know that PVA solution maintains very low viscosity right?

2006-08-09 05:55:55 · answer #3 · answered by still breathing 6 · 0 0