English Deutsch Français Italiano Español Português 繁體中文 Bahasa Indonesia Tiếng Việt ภาษาไทย
All categories

I have a habit of suprising my girlfriend by taking here away on trips, and coming home from my business trips a day early with flowers. Anyways, she is on her toes all the time now, insisting that I could never suprise her again. What I need advice with is what is a good, but romantic way to propose so that she would never expect it?

2006-07-12 21:51:42 · 7 answers · asked by Anonymous in Family & Relationships Other - Family & Relationships

7 answers

You can always take her to the place of your first date and propose there , or you can make what my husband did . He invited me for dinner an his place and when I came through the door there where chocolate kisses on the floor with rose peddles all the way to the bedroom then I found a very big box when I opened it there was another and so on until the small one with the ring with a note saying " Now that I kissed the floor you walk on wou;ld you be my wife and the mother of my children " We have a boy and we are happily married for five years. Hope you can find happiness like we did

2006-07-12 21:58:59 · answer #1 · answered by Dallul 3 · 0 0

Have you taken you to dinner many times? Maybe you could split the desert and have the ring put in it so that you can "accidentally" find it, or something like that. Or have the waiter pretend to bring another dish, but instead have the ring (in the box, or without) on the tray. Maybe a random walk in the park? Also, make sure she's not on Yahoo! Answers, so that she doesn't accidentally see this question LOL

2006-07-12 21:58:55 · answer #2 · answered by High On Life 5 · 0 0

okay get a tractor to pull a flat bed trailer, with a bad up band, and you at the mic. And have the band sind a love song in the background on the trailer and when you have the tractor pull you to her house making alot of noise, and when she comes out. You tell her what and how she means to you and at the end of the mushy stuff say would you marry me. lol

She would remember that for ever.

2006-07-12 21:58:09 · answer #3 · answered by houtexknights330 4 · 0 0

interesting ! =P hmm dinner on the roof wih candles..cook for her sleep on the roof under the sky and propose to her in the morning.. you know the details better =P
Or.. buy tickets for italy, rome is romantic and ask her there.. Go spa together lol and then to her favourite restaurant throw the ring in her glass when she is in women's room
hmm..propose her in a boat maybe under the sky? =P
Ill think about it and i may come up with something..=D

2006-07-12 22:14:04 · answer #4 · answered by Anonymous · 0 0

Organise a 2 hour flight in a hot air balloon,have champagne and strawberries.propose up in the air.unforgettable.she would never expect that in a million years.something you both would never forget.and a tale to tell to friends forever.

2006-07-12 22:25:58 · answer #5 · answered by Anonymous · 0 0

Absolutely all of us get knew names and is not going to remember any one, so if any person doesn't make it, you won't know considering that you won't recall that individual....Variety of sad however i believe it's the simplest approach to be completely satisfied in heaven...By way of no longer being unhappy over folks that we like that didn't make it. We can not be sad if we do not bear in mind them

2016-08-09 00:40:39 · answer #6 · answered by thieme 4 · 0 0

1.Contractor and/or Owner should execute all CIVIL & ELECTRICAL works regarding AC.
2.Contractor and/or Owner Should Provide TUBE between the THERMOSTAT and the INDOOR unit.
3.Contractor and/or Owner should provide three Phase ELECTRICAL CONNECTIONS with 32 AMP ISOLATER next to outdoor unit, and single phase with socket next to indoor unit.
4.Contractor and/or Owner should provide WOODEN FRAME and STEEL FRAME (Sleeves) wherever they needed, either between floors or rooms.
5.Contractor and/or Owner should provide CONCRETE BASE for the OUTDOOR unit where it shown in drawing.
6.Contractor and/or Owner should provide Labor/Winch to LIFT the OUTDOOR units & INDOOR units to where they should be installed.
7.Contractor and/or Owner should provide the needed DRAIN PIPES to the nearest drain point; the pipe should not be less than ¾”.
8.Contractor and/or Owner should provide HOLES either in CONCRETE or in CEMENT BLOCK wherever needed or as shown in drawings.
9.Contractor and/or Owner should provide SCAFOLDINGS where needed in SHAFT(s).

10.Contractor and/or Owner should provide ELECTRICITY where needed in site.
11.Contractor and/or Owner should CLOSE any remains unneeded OPENINGS and HOLES around ductwork, copper pipes and drain pipes.
1.Contractor and/or Owner should execute all CIVIL & ELECTRICAL works regarding AC.
2.Contractor and/or Owner Should Provide TUBE between the THERMOSTAT and the INDOOR unit.
3.Contractor and/or Owner should provide three Phase ELECTRICAL CONNECTIONS with 32 AMP ISOLATER next to outdoor unit, and single phase with socket next to indoor unit.
4.Contractor and/or Owner should provide WOODEN FRAME and STEEL FRAME (Sleeves) wherever they needed, either between floors or rooms.
5.Contractor and/or Owner should provide CONCRETE BASE for the OUTDOOR unit where it shown in drawing.
6.Contractor and/or Owner should provide Labor/Winch to LIFT the OUTDOOR units & INDOOR units to where they should be installed.
7.Contractor and/or Owner should provide the needed DRAIN PIPES to the nearest drain point; the pipe should not be less than ¾”.
8.Contractor and/or Owner should provide HOLES either in CONCRETE or in CEMENT BLOCK wherever needed or as shown in drawings.
9.Contractor and/or Owner should provide SCAFOLDINGS where needed in SHAFT(s).

10.Contractor and/or Owner should provide ELECTRICITY where needed in site.
11.Contractor and/or Owner should CLOSE any remains unneeded OPENINGS and HOLES around ductwork, copper pipes and drain pipes.
1.Contractor and/or Owner should execute all CIVIL & ELECTRICAL works regarding AC.
2.Contractor and/or Owner Should Provide TUBE between the THERMOSTAT and the INDOOR unit.
3.Contractor and/or Owner should provide three Phase ELECTRICAL CONNECTIONS with 32 AMP ISOLATER next to outdoor unit, and single phase with socket next to indoor unit.
4.Contractor and/or Owner should provide WOODEN FRAME and STEEL FRAME (Sleeves) wherever they needed, either between floors or rooms.
5.Contractor and/or Owner should provide CONCRETE BASE for the OUTDOOR unit where it shown in drawing.
6.Contractor and/or Owner should provide Labor/Winch to LIFT the OUTDOOR units & INDOOR units to where they should be installed.
7.Contractor and/or Owner should provide the needed DRAIN PIPES to the nearest drain point; the pipe should not be less than ¾”.
8.Contractor and/or Owner should provide HOLES either in CONCRETE or in CEMENT BLOCK wherever needed or as shown in drawings.
9.Contractor and/or Owner should provide SCAFOLDINGS where needed in SHAFT(s).

10.Contractor and/or Owner should provide ELECTRICITY where needed in site.
11.Contractor and/or Owner should CLOSE any remains unneeded OPENINGS and HOLES around ductwork, copper pipes and drain pipes.
1.Contractor and/or Owner should execute all CIVIL & ELECTRICAL works regarding AC.
2.Contractor and/or Owner Should Provide TUBE between the THERMOSTAT and the INDOOR unit.
3.Contractor and/or Owner should provide three Phase ELECTRICAL CONNECTIONS with 32 AMP ISOLATER next to outdoor unit, and single phase with socket next to indoor unit.
4.Contractor and/or Owner should provide WOODEN FRAME and STEEL FRAME (Sleeves) wherever they needed, either between floors or rooms.
5.Contractor and/or Owner should provide CONCRETE BASE for the OUTDOOR unit where it shown in drawing.
6.Contractor and/or Owner should provide Labor/Winch to LIFT the OUTDOOR units & INDOOR units to where they should be installed.
7.Contractor and/or Owner should provide the needed DRAIN PIPES to the nearest drain point; the pipe should not be less than ¾”.
8.Contractor and/or Owner should provide HOLES either in CONCRETE or in CEMENT BLOCK wherever needed or as shown in drawings.
9.Contractor and/or Owner should provide SCAFOLDINGS where needed in SHAFT(s).

10.Contractor and/or Owner should provide ELECTRICITY where needed in site.
11.Contractor and/or Owner should CLOSE any remains unneeded OPENINGS and HOLES around ductwork, copper pipes and drain pipes.

2006-07-12 21:54:13 · answer #7 · answered by ONE 3 · 0 0

fedest.com, questions and answers