The second that they have dug they have a hole so 1/2 a hole will not exist. Besides if you have four men then they will either head off to the golf course, or even faster just to a local pub to talk about anything besides the 1/2 a hole that they didn't want to dig in the first place.
2006-06-19 22:32:45
·
answer #1
·
answered by fourkidsnomore 1
·
0⤊
0⤋
Simple, the answer is two days. If it takes 1 day for 2 men to dig half of a hole, then it should take 2 days for 4 men to do the same thing. Here's the ratio for representation: 1 day : 2 men= 2 days: 4 men.
2006-06-20 01:26:44
·
answer #2
·
answered by LEWIS KELLER 2
·
0⤊
0⤋
4 men 2 days to dig an entire is the comparable as asserting it is going to take 2 men 4 days to dig an entire. So if it takes 2 men 4 days to dig an entire this means that it will take 2 men 2 days to dig a million/2 an entire. Your answer is two days.
2016-10-31 04:20:59
·
answer #3
·
answered by treiber 4
·
0⤊
0⤋
If two men can dig a hole in 2 days, therefore each one them gave 1/2 part of of the work which means one man can dig that hole for 4 days...
If they will only dig half of the hole, one man can dig it in 2 days.
then if there are four men who will dig that certain hole, then just divide it by four so four men can do that job in just half day.
2006-06-19 22:43:52
·
answer #4
·
answered by bembie719 2
·
0⤊
0⤋
First of all, I've never heard of half a hole. Once you dig, its a hole.
If your talking about half the size of the first hole, then it should take 4 men 12 hours to dig.
2006-06-19 22:58:16
·
answer #5
·
answered by Anonymous
·
0⤊
0⤋
it is impossible to dig half a hole because half a hole is still a whole hole, got me? but if you mean half the hole the two men were digging then its 12 hours/half a day
2006-06-19 22:37:25
·
answer #6
·
answered by ampit_nery 1
·
0⤊
0⤋
what do u mean by half hole
a hole is always a hole
eg
have u heard that it takes 9 months to birth a child
then how much time is used to give birth of a half child
will u then give the answer 4.5 months
think that
2006-06-19 23:40:06
·
answer #7
·
answered by Anonymous
·
0⤊
0⤋
we have been told it takes 96 hours to dig the hole.48+48=96 hours lets assume the half hole is half of the 1st hole so it should take half the time, 48hours now you have 4 men helping so divide 48 by 4 and your half hole should be dug in 12hours. hope you got that.
2006-06-19 22:46:25
·
answer #8
·
answered by julie v 1
·
0⤊
0⤋
1 hole, 2 men, 2 days.
1 hole, 4 men, 1 day.
1/2 hole, 4 men, 1/2 day or 12 hours.
2006-06-19 22:33:25
·
answer #9
·
answered by Anonymous
·
0⤊
0⤋
Half a hole doesn't indicate half the first hole you are talking about, so the answer is 1 day^_^