English Deutsch Français Italiano Español Português 繁體中文 Bahasa Indonesia Tiếng Việt ภาษาไทย
All categories

4 answers

ONE WEEK .

2006-06-21 15:26:07 · answer #1 · answered by maconcrete 2 · 0 1

The driveway can be driven on after the paving contractor has rolled the surface. The roller drums not only compact and smooths the surface, it has a water irrigation system that simultaneously cools the asphalt. When the contractor leaves, the driveway is ready for use.
Although you can drive on the surface immediately, it is recommended to wait about one year before applying any sealcoating.

2006-06-22 14:36:56 · answer #2 · answered by BearDown 6 · 0 0

Give it at least 72 hours before you do it.

2006-06-19 11:32:35 · answer #3 · answered by J.D. 6 · 0 0

TWO DAYS. IT WILL HAVE CURED ENOUGH FOR SMALL VEHICLE BY THEN.

2006-06-19 23:05:37 · answer #4 · answered by petasucks101 5 · 0 0

fedest.com, questions and answers