English Deutsch Français Italiano Español Português 繁體中文 Bahasa Indonesia Tiếng Việt ภาษาไทย
所有分類

沙烏地阿拉伯跨海大橋ㄉ詳細解說
包括 緣由:為甚麼建那橋??
設計者:
施工方法(工法) 材料
花費 工期
維護 挑戰

2007-03-07 08:42:35 · 3 個解答 · 發問者 小Q 1 in 藝術與人文 其他:藝術與人文

對不起唷!!!
有沒有中文網站??????

2007-03-08 16:20:37 · update #1

知道答案ㄉ大大!!!
可以 我ㄉ即時通嗎?????
拜託囉~~~到及時通上談

2007-03-08 16:28:47 · update #2

知道答案ㄉ大大!!!
可以 我ㄉ即時通嗎?????
拜託囉~~~到及時通上談

2007-03-08 16:35:41 · update #3

你可以 我ㄉ即時通ㄇ??.......
不好意思

2007-03-09 16:39:28 · update #4

我要做作業
而解我看不懂英文所以才要中文ㄉ

2007-03-10 18:07:26 · update #5

你會把英文網站用成中文網站ㄇ??
慧ㄉ話可以交我ㄇ???

2007-03-10 18:13:27 · update #6

3 個解答

上網查試試看。

http://www.saudinf.com/main/g13.htm
http://en.structurae.de/projects/data/index.cfm?ID=p00159
http://en.wikipedia.org/wiki/King_Fahd_Causeway
http://zh.wikipedia.org/w/index.php?title=法赫德国王大桥&variant=zh-tw

http://encarta.msn.com/media_461550770_761568494_-1_1/King_Fahd_Causeway.html

2007-03-07 17:26:18 補充:
設計者: consultant Cowi

2007-03-07 17:31:48 補充:
工期 11th November, 1982 -----1986

花費 US$ 1.2 billion

On 11th November, 1982, the cornerstone of the bridge was jointly placed by King Fahd and the then ruler of Bahrain, Sheikh Isa bin Salman Al-Khalifa.

2007-03-07 17:31:54 補充:
This is a four-lane highway, 25 meters wide and about 26 kilometers long. Building works, costing US$ 1.2 billion, financed entirely by the Kingdom of Saudi Arabia, were completed in 1986 (1406/07 AH) and the Causeway was opened to traffic at the end of that year.

2007-03-07 17:37:26 補充:
satellite images

http://www.terraserver.com/imagery/image_gx.asp?cpx=50.3241271&cpy=26.18405561&res=60&provider_id=340&t=pan&dat=&OL=Off

2007-03-08 23:41:08 補充:
有沒有中文網站????
有英文的就要偷笑了
請問你在廿一世紀要這個一九八幾年的東西幹嘛??

2007-03-08 23:54:02 補充:
http://www.bni.ballast-nedam.com/outsite/projects.nsf/WWWPSBI/B9B1D0ADDE280C12C1256B900028C140?OpenDocument

http://www.bbr-conex.hr/cro/prestress/cona-multi.htm

2007-03-08 23:57:07 補充:
Half of this permanent construction has been constructed as a dam and the part bridged over consists of five unequal bridge sections. To facilitate the work, a work island was reclaimed north-west of Bahrain for the construction of factories, linked to Bahrain by a dam for transport purposes.

2007-03-08 23:57:37 補充:
Channels had to be dredged to enable the heavy transport of construction elements to the building site. For the construction of the embankments a quantity of 5 million tons of rock and broken stones has been used as well as some ten million m³ of sand that has been dredged from the sea bottom.

2007-03-08 23:57:59 補充:
The foundation and superstructure of the bridges is built of prefabricated elements, the biggest of which having a weight of 1200 tons. The sunken foundation caissons for the main span are poured in with underwater concrete.

2007-03-08 23:58:11 補充:
Activity: International
Principle: Min. of Finance and National Economy - Riyadh, Saudi Arabia
Location: Saudi Arabia, Bahrein
Status: Current
Costs: USD 576,000,000

2007-03-09 00:03:19 補充:
今天運氣好,找到兩張工法資料,

2007-03-11 09:10:39 補充:
可以用電腦翻譯機翻
也可以用手工查字典翻
用手工查字典翻完一篇之後,再翻類似的文章就容易了
建議你先用手工查字典翻下面這網頁 http://en.wikipedia.org/wiki/King_Fahd_Causeway
翻完之後,再看看下面這中文的 網頁
http://zh.wikipedia.org/w/index.php?title=法赫德国王大桥&variant=zh-tw

http://zh.wikipedia.org/wiki/法赫德国王大桥

2007-03-11 09:27:28 補充:
你會把英文網站用成中文網站ㄇ??
要這樣說
你會把英文網站 弄 成中文網站 嗎 ??

2007-03-11 09:34:15 補充:
http://en.wikipedia.org/wiki/King_Fahd_Causeway 的第一段翻譯如下
The King Fahd Causeway (Arabic: جسر الملك فهد‎) is multiple dike - bridge combination connecting Khobar, Saudi Arabia, and the island nation of Bahrain

2007-03-11 09:34:48 補充:
第一段翻譯如下
法哈德國王堤道公路(阿拉伯文: جسر الملك فهد‎)是由多個海堤與橋樑組成連接沙烏地阿拉伯的Khobar 與島國巴林。

其他的自己翻,翻完之後,我再把工法資料給你。

2007-03-07 11:59:39 · answer #1 · answered by travelpa 7 · 0 0

一起玩情趣用品網路商城,提供成人情趣用品、情趣內衣等,全省宅配到府、超商付款包裝隱密,歡迎參觀選購。

一起玩情趣用品官網:http://www.17one.net

一起玩情趣用品粉絲團:https://www.facebook.com/17one

2015-02-21 06:59:04 · answer #2 · answered by vvcvee 1 · 0 0

對不起唷!!!因為我沒點數ㄌ!!!你可以+我即時同慢慢談

2007-03-08 16:19:38 · answer #3 · answered by 小Q 1 · 0 0

fedest.com, questions and answers