English Deutsch Français Italiano Español Português 繁體中文 Bahasa Indonesia Tiếng Việt ภาษาไทย
所有分類

USE 方程式

1) there are 65 wokers in a project of digging and removing mud from a working site . Each worker can dig 2.5m of mudor remove 30m mud everyday . If the surpervisor of this project wants to allocate the workersin such a way that the mud dig every day can be remove on the same day,find an appiopriate method of allocating the workers?

Let X be the no.of workers who dig , then the no. of workers who is move mud is 65-X.

2006-10-30 10:36:58 · 4 個解答 · 發問者 cute girl 2 in 教育與參考 小學及中學教育

4 個解答

1.
Let the number of workers digging the mud be x
2.5x = 30(65 - x ) .
2.5x = 1950 - 30x
32.5x = 1950
x =60
the number of workers digging the mud should be 60
the number of workers removing the mud should be 5

2006-10-30 10:39:38 · answer #1 · answered by J 7 · 0 0

2.5x = 30(65-x)
2.5x = 1950-30x
32.5x = 1950
x = 1950/32.5
x = 60

60 workers should dig , (65-60)=5 workers should move mud

2006-10-30 11:13:06 · answer #2 · answered by sen ho 1 · 0 0

2.5X = 30(65-X)
2.5X = 1950-30X
32.5X = 1950
X=60

the no.of workers who dig is 60
the no. of workers who is move mud is (65-60)=5

2006-10-30 10:46:10 · answer #3 · answered by KAT 6 · 0 0

let x = workers who dig
65-x = workers who move

2.5x = 30(65-x)
2.5x = 30(65) - 30x
2.5x + 30x = 30(65)
32.5x = 1950
x = 1950/32.5
x = 60

60 workers should dig, 5 workers should move

2006-10-30 10:43:48 · answer #4 · answered by bb 3 · 0 0